You are seeing a free-to-access but limited selection of the activity Altmetric has collected about this research output.
Click here to find out more.
Timeline
Chapter title |
Study on Comprehensive Detection and Treatment Measures of Qinlan Tunnel of Tianba Expressway Crossing Large Karst Cave
|
---|---|
Chapter number | 32 |
Book title |
Proceedings of the 2nd International Conference on Innovative Solutions in Hydropower Engineering and Civil Engineering
|
Published by |
Springer, Singapore, January 2023
|
DOI | 10.1007/978-981-99-1748-8_32 |
Book ISBNs |
978-9-81-991747-1, 978-9-81-991748-8
|
Authors |
Wang, Xiaoming, Zhou, Yongxing, Zhang, Gang, Chen, Xueqi, Liu, Zhiqiang, He, Xiaoyong |